logo
Skip Navigation Links
valide!
valide!
 
Projects » Chile » Mining
valide!
  Español | English | Português | 中文    
Argentina
Brazil
Chile
Colombia
Perú
valide!
 Mining
Electric Substation for Escondida

Description:
This includes the construction of a coupling substation with a voltage of 69 kV in Monturaqui-Negrillar, located in the Region of Antofagasta.


More...

   

 

bottom
Argentina (54-11) 4302 2951/58 | Brasil (55-21) 2702 8000 | Chile (56-2) 389 7300 | Colombia (57-1) 417 3000 | Perú (51-1) 561 0461
© Copyright 2009